Expédition à

Autoportant

Assembly

Nombre de tablettes: 5

Installation Requise
À propos de ce produit
Dimensions du produit

Autres dimensions
Détails
Assemblage
Garantie
Documents
Pour tous les articles achetés entre le 1er novembre et le 31 décembre, la date limite de retour est prolongée jusqu'au 31 janvier. Des exclusions s'appliquent.
Apprenez-en plus
ou

Accumulez {RICH_TEXT_POTENTIAL_REWARDS} en récompenses, avec une remise de 5 %¹, en plus d’autres avantages exclusifs.
Noté 4.8 sur 5 étoiles.
Avis 1-5 de 8
Noté 4 sur 5 étoiles.
Very happy with this item and looks great in the bathroom. Provides a good amount of extra storage.
Noté 5 sur 5 étoiles.
I love this and so functional! Quality craftsmanship and bought another one for our second bathroom.
Noté 5 sur 5 étoiles.
The installation and assembly were executed wonderfully the individual responsible performed an excellent job. The free-standing toilet storage rack appears very solid in its finish, and overall, it is remarkable. He was very professional and kind.
Noté 5 sur 5 étoiles.
I love this cabinet! It fit like a glove, and has all of the extra room I needed in my small bathroom! I was able to put it together (without my husband..), and without struggle. Quality product.
Noté 4 sur 5 étoiles.
Overall Its what I wanted! I picked it mainly to fit tight and snug in my small toilet space in my bathroom and while I didn't double check all the dimensions myself... It fit the way it was advertised. Lets talk Assembly instructions for a little bit! Starting off, step 1 was a little confusing because the #9 screws for #11 magnet aren't in the same bag, but other really similar screws are.... confusing!!! Took me a second to realized the white sticker numbers on the bags are the Hardware list, but also...the black printed numbers are also the labels of the hardware! so the #9 needed in step one are spread out in like 3-4 bags! weird! Steps 2-9 nothing to comment. Step 10 (see picture) the magnet on P is located down. Step 11 (see picture) verify the hole in F, not shown, on the side, is located away from the "D" board. Step 13, You need to flip both pieces over from the previous steps and do all but the circled one (see picture)... THEN flip back over...i know annoying... and heres where I say build your own adventure!! GOTO step 18 while you have it flipped over with its back showing. From here I personally would goto step 19 and install it on the wall. Step 19 needs alot of work in the instructions!!! I ran out of room adding all the extra steps I recommend/did. Lets start with placing the cabinet. To clarify, you need to pick up the entre cabinet and slide it behind your toilet so make sure you Board "D" can fit between your toilet lid and the wall! Mine barely did! Also your ceiling must be tall enough to pick up "D" over the top of your toilet. 3 measurement photos below show you need at least an 89" ceiling height (89" = 66" - 8" + 31" for my toilet). Lets add a bunch of missing steps they should have added to step 19! 19A: set in place by sliding over toilet. 19B: Mark holes in wall through #13A holes. 19C: loosen #13-C screws and turn 90 degrees to be out of the way for drilling (see picture). 19D: Drill hole in drywall with, I think a 1/4" drill bit (I used a 5/16" and for one side I happen to hit a wood stud, so 5/16" worked. For the other side, it was drywall only as intended and was too big and basically didn't work. oof. I used a spare #1 screw instead and a little better but doesn't really work). 19E: press #13-B wall anchor into wall. 19F: turn #13A back and loosely screw in #13-D wall screws to make sure everything aligns. 19G: Tighten both #13-D and #13-C screws. After step 19 were in the home stretch. I recommend step 16, then step 14 (see picture), then step 17, then step 15. You are left with a little pile of extras (see picture). For step 16. You can change the location of C after everything is assembled fyi.